Selecting a medium-pressure UV power supply starts with the lamp’s operating requirements, not only the kilowatt rating on a quotation. The supply must suit the lamp voltage and current, establish the required starting conditions, accept the equipment’s control signals and operate within the cabinet’s thermal limits.

This guide reviews the HS-EPS1KW, HS-EPS2KW, HS-EPS3KW and MPLB-1PH-A-2000 examples in the product documentation available through BIOSUN. It gives OEM buyers a practical way to compare the models and prepare an installation specification before sample approval.

Purple-top digital UV power supply and silver medium-pressure ballast with original control panel labels fan vents and green terminals
Original product photographs illustrate medium-pressure UV power-supply layouts. Confirm the selected model, input supply and installation requirements using its approved documentation.

Start With the Lamp and Application

Prepare the exact lamp model, rated electrical power, operating voltage, current, ignition requirements and intended duty cycle. Also identify the application, cooling arrangement and equipment control method. A supply with the right nominal power can still be unsuitable if its operating window or startup behavior does not match the lamp.

The BIOSUN UV ballast and power-supply range covers several product families. The UV electronic ballast range comparison introduces the lower-current models; medium-pressure supplies require their own lamp and installation review.

HS Medium-Pressure UV Power-Supply Comparison

The HS manual lists the following model-specific output data. Use the table to shortlist a supply, then confirm the actual lamp, ordered version and approved drawing.

HS model output data from the supplied manual.
Model Power class Output-voltage range Maximum output current Recommended lamp voltage listed
HS-EPS1KW 1 kW 100-220 V 10 A 200 V
HS-EPS2KW 2 kW 160-220 V 13 A 200 V
HS-EPS3KW 3 kW 300-460 V 12 A 400 V

Interpret these limits together: maximum voltage and maximum current are not a promise that both can be delivered simultaneously at every operating point. The model’s power rating and approved lamp operating range still apply. These voltage values describe the stated operating range, not the ignition-voltage specification.

The manual describes panel operation, terminal control and RS485 functions. Confirm which interfaces and options are supplied with the ordered unit, together with the command definitions and settings needed for the equipment controller.

MPLB-1PH-A-2000: A Separate 2 kW Configuration

The MPLB manual specifies 2000 W lamp power and 2100 W maximum input power. Its nominal input is 230 V at 50/60 Hz, with a stated 198-264 V input range. These mains-side requirements should be kept separate from lamp-side operating values.

The manual describes two product versions with different lamp-current limits, below 9 A or 11 A respectively. Buyers should identify the required version on the quotation and approved drawing. These are not two settings that can automatically be selected on every unit.

Power Adjustment and Start/Stop Are Different Functions

The MPLB document describes a 400-2000 W lamp-power control range. Its PWM interface is specified at 1-4 kHz with a 24 V high level, and start/stop is a separate control input. A low power command should therefore not be treated as an assumed off command.

The command range also does not prove that every compatible lamp or application may operate continuously at its lowest setting. Approve the minimum operating point with the actual lamp and process. For a broader explanation of interface differences, see the UV ballast control-interface comparison.

Confirm the Input Supply From the Ordered Configuration

The HS family documentation describes single-phase 220 V and three-phase 380 V input versions. A purchase specification should state the exact phase configuration, nominal voltage, frequency and approved input range for the selected unit.

For an export project, provide the destination supply information at the quotation stage. Use the actual unit nameplate and approved wiring drawing to finalize input current, conductors, protective devices and terminals. Do not select a supply connection from the power class or a similar-looking product photograph alone.

The electrical design also needs to account for startup demand when several supplies share a cabinet. Establish an approved start sequence and supply-protection arrangement for the actual quantity of units.

Cabinet Cooling and Installation Space

A compact housing still needs sufficient cooling and service access. Check the inlet and outlet positions, fan clearance, mounting orientation, nearby heat sources and the temperature of the air entering the supply. Do not arrange cabinets so one unit continually receives another unit’s hot exhaust.

HS Series Conditions

The HS manual lists IP52 construction, forced-air cooling with an independent airflow path and an ambient range of -10 C to +50 C under its stated conditions. The ventilation path and installation environment should be reviewed against the full manual before enclosure approval.

MPLB Conditions

The MPLB manual specifies IP20, a dry installation environment, ambient temperature from -5 C to +40 C and a housing-temperature limit of 60 C. Keep the installation within the approved limits. Adding a fan should not be assumed to authorize operation beyond the specified ambient range.

For an enclosure containing several supplies, validate the complete loaded cabinet. Record temperature under the intended continuous operating conditions rather than approving the layout from a single unit on an open bench.

Lamp Cable Length and Routing

The lamp-output cable is part of the electrical system. Length, conductor specification, insulation and cable capacitance can influence starting and must be agreed for the selected supply. Confirm the complete cable assembly before the cabinet is released to production.

The MPLB manual identifies 2.5 m as a preferred lamp connection distance and also gives restrictions on longer connections and cable capacitance. A longer run needs a confirmed cable specification and supplier approval; the installation should not be extended simply because a connector is available.

Provide the actual route between cabinet and lamp, including connectors and installation space. Keep the approved power-output and control-wiring arrangements documented, with the lamp connectors and accessories specified for the project rather than selected only by appearance.

Controller Integration and Operating Feedback

Define how the controller starts the supply, requests power, recognizes successful ignition and handles a fault. The HS documentation describes panel, terminal and RS485 operation, while MPLB uses its documented PWM and discrete-signal interface. Match the interface of the ordered version.

Confirm Signal Levels and Definitions

Document command voltage, pulse frequency where relevant, signal reference, output type and the meaning of each state. For digital communication, obtain the protocol and required settings before PLC programming. Do not transfer a control scheme from another ballast model without checking its specification.

Separate Lamp Start From Process Readiness

A successful-start signal indicates a defined operating state. It is not, by itself, evidence that the treatment or curing process has reached its required performance. The equipment must define warm-up, operating acceptance and the response to a lamp or supply fault.

The UV power-control guide covers sequencing considerations, and the UV monitoring guide explains why electrical status and optical monitoring serve different purposes.

OEM Sample and Commissioning Checks

1. Verify the Delivered Configuration

Record the supply model, lamp model, input configuration, control option and wiring-drawing revision. Compare the delivered unit with the approved sample and purchase order.

2. Test With the Actual Lamp Cable

Use the intended cable length, connector and routing. Confirm startup and stable operation under the installation conditions that the production equipment will experience.

3. Check the Approved Power Range

Evaluate the approved minimum, intermediate and rated operating points. Record the controller command and the supply’s monitored voltage, current and power where available. Confirm that the lamp remains within its permitted operating conditions.

4. Validate the Loaded Cabinet

Run the equipment long enough to assess its intended duty cycle and temperature conditions. Check supply cooling, cable support, mounting access and the effect of neighboring units.

5. Verify Fault and Recovery Logic

Use approved test procedures to check the specified fault responses, controller indications and recovery after an interruption. Record which actions require operator acknowledgement and which may occur automatically.

Keep the results with the UV component sample-approval record so engineering, purchasing and the supplier use the same production reference.

Maintenance and Replacement Planning

Include cooling fans, air paths, terminals and fault records in the maintenance plan. Inspect equipment using the isolation and service procedures for the installed model. Keep vents clear and investigate abnormal temperatures or repeated starting faults before continuing service.

For a replacement order, send the existing supply marking, lamp data and wiring information. A replacement should be reviewed for its control interface, mounting and cooling requirements as well as power rating. The UV spare-parts stocking guide can help service teams organize approved replacement combinations.

Information Needed for a Medium-Pressure UV Power-Supply RFQ

The BIOSUN OEM and ODM service can support selection and sample coordination for the complete lamp, supply and control arrangement. Share the application requirements using the UV application solutions page as a starting point for project discussion.

Frequently Asked Questions

Can any 2 kW UV supply run any 2 kW lamp?

No. Operating voltage, current, ignition behavior, lamp construction and approved control range also need to match.

Is the maximum output voltage available at the maximum output current?

Not necessarily. The voltage and current limits must be considered together with rated power and the approved operating window.

Is 2100 W the lamp rating of the MPLB-1PH-A-2000?

No. The supplied manual lists 2000 W lamp power and 2100 W maximum input power.

Can I reuse a PWM controller from a different UV ballast?

Only after checking signal voltage, frequency, duty-cycle behavior, references and the separate start/stop requirements for the exact supply.

Can the photographed enclosure determine the input connection?

No. Confirm phase configuration, supply voltage and terminal assignments from the actual unit nameplate and approved wiring documentation.

Request a Matched Medium-Pressure UV Power Supply

Send BIOSUN the lamp specification, input supply, controller requirements and cabinet drawing through the BIOSUN contact page. Those details allow the team to review the appropriate power class, operating window and installation arrangement before a sample is approved.